peter d
Senior Member
- Location
- New England
You mean this one? :grin:
Oh, sorry. That's SER.
What kind of abortion....err...I mean installation is that? Even that is below my already low standards.
You mean this one? :grin:
Oh, sorry. That's SER.
That is the "we want all the tenants to have their own meter and if it costs more than 40 thousand, we're not doing it" special.What kind of abortion....err...I mean installation is that? Even that is below my already low standards.
That is the "we want all the tenants to have their own meter and if it costs more than 40 thousand, we're not doing it" special.
a data center i did........
a data center i did........
You think a landlord that went to the trouble to get separate meters is going to keep one furnace?Looks like a crack house. Is that 2/3 SER? If so, why so big? Electric heat?
You think a landlord that went to the trouble to get separate meters is going to keep one furnace?
Residential remodel (big house):
Killer pipe? I'm pretty sure someone got killed after they installed this:
Long time lurker, first time poster. Here a few pics of some jobs I have done in the past
Control panels at a factory with wireway leaving them feeding power, data and control wiring.
Wireway from underneath
Switchgear at a hospital chiller plant, everything fed from the slab
Switchgear (2 5000 amp services)
It seems that you have a large gear, 480V with only one entrance to the space. The entrance does not look large enough. Am I seeing the right thing or not?
residential gets boring after a while and nothings better than wrestling with 500 mcm's after playing with those little 14 and 12 awg conductors all day
Yea that kind of work is fun for a while untill you hit 35-40 and your back feels like your 60.There are actually three entrances into the room, two double doors and a single man door on the far end
Here?s another shot inside the gear, all the phase conductors are 750 kcm
You can keep the 500's. I'll take the 12 and 14, thank you very much.
Yea that kind of work is fun for a while untill you hit 35-40 and your back feels like your 60.
thats when you make the young kids bend all the wire into place and you just do all the planning. thats what the future holds for me hopefully