Flying Wireman
Member
- Location
- Chicago
- Occupation
- Supervising electrician
Maybe he is using what I circled in the pic.
18" from edge to edge.
So I had a meeting today with the POCO supervisor, who in short told me there is no issue with the meter install and to leave it as is.
The rep that came out initially thought the POCO crew that has to run the service wires from utility transformer to meter might not have enough room to work because of that railing…
So it does seem that there was a bit of overzealousness involved…Glad it got sorted out!