wrobotronic
Senior Member
- Location
- Colorado
Hi all,
is there a specific requirement in the NEC regarding the cages of pole bases having to be bonded/grounded (not sure what word to use here.) to the equipment ground for the fixtures? I have always "just done it" and have never really known if it's required. As an electrician I always thought it was for lightning protection and never questioned it. Thank for your help.
Finally, should I put this post into the NEC forum?
is there a specific requirement in the NEC regarding the cages of pole bases having to be bonded/grounded (not sure what word to use here.) to the equipment ground for the fixtures? I have always "just done it" and have never really known if it's required. As an electrician I always thought it was for lightning protection and never questioned it. Thank for your help.