I have a contractor who has installed SJOW cord as the branch wiring within a light pole (from the hand hole up to the fixture head). I have quoted NEC (2005) 400.8 -not as a substitute for permanent wiring and the requirements of 410.30. Contractor says the light pole is considered a raceway and the install is legal per 400.14 (we are in an industrial waste water plant).
Comments either way??????