Hi,
I just got off the phone with the local building inspector. I asked him to explain to me what he thought the NEC wanted in a pool bonding grid system for an above ground pool.
He explained to me that the NEC wants a #8 awg solid copper conductor connected to the pool wall, then to the grounding (bonding) lug on the pool pump, then to connect this conductor to the service panel ground or neutral. Is this what the NEC intended?
Can you clear this up for me?
Thanks.
I just got off the phone with the local building inspector. I asked him to explain to me what he thought the NEC wanted in a pool bonding grid system for an above ground pool.
He explained to me that the NEC wants a #8 awg solid copper conductor connected to the pool wall, then to the grounding (bonding) lug on the pool pump, then to connect this conductor to the service panel ground or neutral. Is this what the NEC intended?
Can you clear this up for me?
Thanks.