Can anyone clarify?
Granted 550.4(A) will probably be your answer, after you find out what your AHJ will WANT, I personally, have seen 3 wires with electrode system and frame grounded and have seen the 4 wire systems with the disconnect external and sub-panel config. inside. Murphy's Law is if you do it one way, he will want it the other.DCarc said:I am needing to wire up a job site portable building and everything that I have read about the code does not state that I need to run multiconductor cable inside of conduit provided that it is out of harms way. Can anyone clarify?
Inspectorcliff said:Granted 550.4(A) will probably be your answer,
iwire said:550 will not apply unless this building started out life as a mobile home.