Fnewman
Senior Member
- Location
- Dublin, GA
- Occupation
- Sr. Electrical Engineering Manager at Larson Engineering
As a part of a current project, a new pre-fab metal building is to be constructed, the end of which will be near an existing pole line - no bare conductors, just 600v cables on messengers. We have been discussing what, if any, code required clearance would be required between these suspended cables and the building wall. TIA