Fnewman
Senior Member
- Location
 - Dublin, GA
 
- Occupation
 - Sr. Electrical Engineering Manager at Larson Engineering
 
As a part of a current project, a new pre-fab metal building is to be constructed, the end of which will be near an existing pole line - no bare conductors, just 600v cables on messengers.  We have been discussing what, if any, code required clearance would be required between these suspended cables and the building wall. TIA
	
		
			
		
		
	
				
			
				