Hi,
We are currently calculating the capacity of a standby diesel generator to feed a telecom center. However, our customer would also like to include the air conditioning units (2 x 36.000 BTU). Although separate circuits are projected from a secondary panel powered by the generator (during electric outages); would it be acceptable to have inductive load included in this scheme ? Any suggestions ?
Thanks
We are currently calculating the capacity of a standby diesel generator to feed a telecom center. However, our customer would also like to include the air conditioning units (2 x 36.000 BTU). Although separate circuits are projected from a secondary panel powered by the generator (during electric outages); would it be acceptable to have inductive load included in this scheme ? Any suggestions ?