mshields
Senior Member
- Location
- Boston, MA
just noticed this term, possible typo in a guide form spec I'm working off of for Overhead Distribution. The sentence it is used in is as follows:
"The contractor is responsible for verifying the praoti cableness of the location, notifying the engineer in any instances where not the case, and not proceeding until given direction by same."
I assume its a typo but can't guess what it was supposed to say. Any idea's?
"The contractor is responsible for verifying the praoti cableness of the location, notifying the engineer in any instances where not the case, and not proceeding until given direction by same."
I assume its a typo but can't guess what it was supposed to say. Any idea's?
