My company is wanting to me get into prefabricating
as much as I can in the on going job I am currently working on.
The product will consist of this: 1-25'HCF cable connected to 1- 1900 box with a mounting bracket(caddy),a 3/4" mud ring and a receptacle with tape as protection from paint and sheetrock mud,(all of this will be done 150 times) now the parts I listed will be mostly typical on this project and are subject to change according to the need of the application.
This product will be used in patient rooms (normal power only)and any other areas where a typical product like this can be applied.
I am unsure of the cost saving and I am interested in what some of you that have done this before have to say.
I would like to here some pro's and con's on this subject.
All opinions will be appreciated
dcv :roll:
as much as I can in the on going job I am currently working on.
The product will consist of this: 1-25'HCF cable connected to 1- 1900 box with a mounting bracket(caddy),a 3/4" mud ring and a receptacle with tape as protection from paint and sheetrock mud,(all of this will be done 150 times) now the parts I listed will be mostly typical on this project and are subject to change according to the need of the application.
This product will be used in patient rooms (normal power only)and any other areas where a typical product like this can be applied.
I am unsure of the cost saving and I am interested in what some of you that have done this before have to say.
I would like to here some pro's and con's on this subject.
All opinions will be appreciated
dcv :roll: