preparing a panel schedule

Status
Not open for further replies.
Hi ,
Could anyone pls help me on preparing a panel shedule.
What is load KVA for each branch
& demand load.
Panel details are
a) Supply for lighting, receptacles, and equipment accessories shall be a 600 Volt feeder, by others, supplying the Main Panel board
b) One (1) 600V, 3P, 3W ,(Tag No) Main Panel board CSA, three phase, rated 18 kAIC with separate, isolated ground , 24 Circuit, Flush Front .
With one(1) 150A, lockable main breaker, with minimum 150A main
busses. Provide one(1) 60A circuit breaker, 3pole, (for building mounted welding receptacles), three(3) 60A, 3phole, circuit breakers (for switchyard welding receptacles installed buy others), one(1) 50A, 3Pole circuit breaker to feed a 30kVa, 3Phase transformer, and a minimum of two(2) spare 20A, three-pole circuit Breaker (for buyer's use). Circuit directory must be provided on panel board. (Note: lockable 150A main breaker)
Thanks in advance
regards,
Gayathri shriram
 
panel

panel

without knowing the specifics about the actual loads, I don't believe you can reach the desired results.
 