This is my first post on this forum. As a quick overview, I have a large shop/equipment building that is adjacent to where my new home will be constructed. The equipment building is complete, the home won't break ground until next year. The new pad mount utility transformer is adjacent to the new equipment building. The service size is 400A. Ultimately, I want the shop to have a 150A load center (sub panel), and the main house to have two, 200 A load center (sub panels). Inside the equipment building, immediately after the meter socket, I am assuming would need a 400A fused disconnect, followed by a 600A trough that would allow me to connect each of the 3 sub panels. Here are my questions:
1. Is this the best way to do this or is there a better way?
2. Is the 400A fused disconnect better than a 400A breaker in an enclosure?
3. I have never used a trough, but if that is the best way to go, the ones I have seen have bus bars inside. How do I make the connections to the bus bars.
4. Any links to specific equipment would also be helpful.
Thank you for the help!
Greg
1. Is this the best way to do this or is there a better way?
2. Is the 400A fused disconnect better than a 400A breaker in an enclosure?
3. I have never used a trough, but if that is the best way to go, the ones I have seen have bus bars inside. How do I make the connections to the bus bars.
4. Any links to specific equipment would also be helpful.
Thank you for the help!
Greg