Did a search on the State of Florida's website and found their Construction Standards for Traffic Signals. It does not mention distance between pull boxes only if more than 360 degrees of bends then a pull box is required.
I'm seeing this as having metered and unmetered conductors in both the pull box and the service disconnect. NEC has no problem with that, but many POCO's won't like that.
I'm seeing this as having metered and unmetered conductors in both the pull box and the service disconnect. NEC has no problem with that, but many POCO's won't like that.