Pull box sizing and 314.28

Status
Not open for further replies.

LarryFine

Master Electrician Electric Contractor Richmond VA
Location
Henrico County, VA
Occupation
Electrical Contractor
Are the LBs marked? What's the markings say?
The long one is, but the short one isn't. Hopefully, the inspector won't bring it up, but if he does, I hope to convince him it's better than the larger aluminum wires that were in it, and entering the switch means less bend on the wires.

We're done with it, by the way.

IMG_0477.JPG IMG_0476.JPG
 

LarryFine

Master Electrician Electric Contractor Richmond VA
Location
Henrico County, VA
Occupation
Electrical Contractor
We ended up reducing the 3" to 2.5" to suit the depth of the panel. Another 2.5" would still work: 2.5 x 6 = 15 + 2.5 = 17.5

Here are some pics:


In from outside:

IMG_0483.JPG


Then through here:

IMG_0484.JPG


Into the box:

IMG_0482.JPG


Around the bend:

IMG_0481.JPG


All closed up:

IMG_0485.JPG


And down to here:

IMG_0480.JPG
 
Status
Not open for further replies.
Top