Situation: 30 Ton RTU is being replaced and customer wants new conductors pulled in. On the rooftop there is a run of 110' with three 90's and two kicks between two LB's and I cannot budge the conductors with our tugger at all. It is a 3" GRC with four 350mcm. There is alot of dried wire lube in the LB's and I am out of ideas short of cutting GRC and then repairing it. Any ideas guy's? Thanks.