mstrlucky74
Senior Member
- Location
- NJ
I know dumb question. Existing underground conduits already installed underground. 2 new building being built with bottom feed switchgear going in slab on grade. You obviously can't pull the wire after they pour the slab but before the gear is set, correct? THinking you may be able leave enough slack and have the gear set over it and then pull it in/up.