CharlieSW
Member
- Location
- Annapolis, MD
I am installing a pump in a class 1 div 2 wet well. I am trying to provide ease of pump removal for maint and or burnout. Here is how I wish to do this. I want to come out of the wet well with the manufacturer's cable via conduit to a junction box (JB). The JB will be provided with terminal strips to transition from hardwired ckts to manufacturer's cable. The JB will be located outside of the haz loc. If I provide an XP JB and seal the ckt off only on the upstream side of the JB, am I in violation of any code? If I seal the ckt off on the down stream side removal of the pump is not as easy. What other concerns should I be aware of?