I'm working on a project that we will be using approx. 40KW DC power to produce approx. 50KWH/per year. The building voltage is 480/277V with 1200A service. The PV system we are proposing to use will have mutiple (4) clustor of PV panels with 4- 10KW inverters. The thought is, each inverter is to feed a sub-panel (4-lighting panels). I was told I can not feed sub-panels from PV system, it has to go to the main switchboard. Is this true that I can not feed sub-panels from PV system? Thanks,