Wrongway
Member
- Location
- Vacaville, ca USA
County building dept says I have to have two ground rods within 6 feet of each other for a 3.3 kW residential roof mount solar system. 200 amp main panel. I have read all of 2011 NEC section 250 and 690 but can't find any requirement for this. Is there a code requirement for this? Thanks