pv system code reference

Status
Not open for further replies.
Welcome to the forum :thumbsup:

Sorry, but I know of no such requirement. Are you certain it exists???

The only issue I'm aware of regarding a quantity of six is 690.14(C)(4) Maximum Number of Disconnects. A search for six in the 2011 NEC PDF version confirms this subsection as the only one in Article 690. Perhaps it's a myth based on this requirement...
 
Status
Not open for further replies.
Top