Similar to another poster I've done lots of utility scale but very little residential.
I have a customer who has an array on their roof with inverters that feeds back to a disconnect on the exterior of the house. 20 amps 4 wire. There used to be AC units (Lennox I think but don't remember) that tied into this disconnect and used the solar panels to power the HVAC units. Units were ripped out and new ones don't havre that capability. SO now they have solar power that isn't being used.
I would like to tie it into a sub panel in the basement that has plenty of room. It also already has labels etc noting pv system is in use. Can I just tie the pv disconnect into this sub panel (12/3 on a 20 amp 2pole ) and be code compliant?
I have a customer who has an array on their roof with inverters that feeds back to a disconnect on the exterior of the house. 20 amps 4 wire. There used to be AC units (Lennox I think but don't remember) that tied into this disconnect and used the solar panels to power the HVAC units. Units were ripped out and new ones don't havre that capability. SO now they have solar power that isn't being used.
I would like to tie it into a sub panel in the basement that has plenty of room. It also already has labels etc noting pv system is in use. Can I just tie the pv disconnect into this sub panel (12/3 on a 20 amp 2pole ) and be code compliant?