So I inspected 3 different jobs in the last two days that were underground pvc conduits emerging from grade into fixed points, LB or meter socket
no expansion couplings were used and I did not approve any of the installations
one guy buried the expansion on the verticle riser from below grade to the 400 amp meter
Where is the common sense. How can it do its job buried!!! Not to mention it should not be buried
one electrician argued with me that it wasn't needed or required
any thoughts
no expansion couplings were used and I did not approve any of the installations
one guy buried the expansion on the verticle riser from below grade to the 400 amp meter
Where is the common sense. How can it do its job buried!!! Not to mention it should not be buried
one electrician argued with me that it wasn't needed or required
any thoughts