wirebender
Senior Member
- Location
- North Central Texas
220/221 said:They used "or" between the 3 items and no comma after masonry so I suppose that makes them separate.
Not necessarily.
220/221 said:Now I am seeing underground as one thing and concrete slabs/masonry as another beacause they say in concrete slabs or masonry, not in concrete slabs or in masonry.
That's the way I see it.
220/221 said:Really? I wouldn't have thought that. If that's the case, case closed.
I realize that common sense has nothing to do with the code but even the NEC wouldn't consider something a wet location which is inherently moisture free.