I'm upgrading a split service (100 amps each) into 1 service, that is, one meter and one new 200 amp panel. The only way to accommodate the new panel is to move it 2 feet to the right (because of a new washer/dryer install). Therefore, I have to extend all the branch circuits to the new panel, as they will not reach as they are. I'm using a 2 foot wire trough with knockouts to gather all the existing wires, and splicing them inside the trough. I was hoping to feed them all into the new panel through a short section of 2" PVC conduit on a side knockout in the panel. Is this a violation of 312.5(c)? Will I have to run them all individually to the new panel?