Alwayslearningelec
Senior Member
- Location
- NJ
- Occupation
- Estimator
Would you factor down the install time for installing conduit under raised floor(no raised floor installed at time of install) as opposed to installing overhead?
I'd think it would be quicker.
I'd think it would be quicker.