I just wanted to confirm that I'm reading 690.12 correctly. If I install an SMA Core 1 within 3ft of the array, I do comply with the Rapid ashutdown requirements for building roofs, correct? It is listed for rapid shutdown I see in the spwc sheet - "SunSpec PLC signal for rapid shutdown."