What is the going rate to install subpanel that is 140ft from main panel. All ladder work. Subpanel is 40amps, 12spaces. Big pole barn with a wall separating them. This in Ohio. Sorry about the lack of infro. Using # 6 NM cable, stapling to barn rafters, working off of extension ladder.
Last edited: