S sharan Senior Member Apr 13, 2009 #1 To convert an existing 200A fused disconnect service to 100% rated, what equipment would need to be replaced? Panel, disconnect, fuses?
To convert an existing 200A fused disconnect service to 100% rated, what equipment would need to be replaced? Panel, disconnect, fuses?
George Stolz Moderator Staff member Location Windsor, CO NEC: 2017 Occupation Hospital Master Electrician Apr 13, 2009 #2 The biggest change would be to the grounding of the system. Without more details, we don't have a lot to work with.
The biggest change would be to the grounding of the system. Without more details, we don't have a lot to work with.