kanderson
Member
- Location
- Irving TX USA
Hi All,
I am seeking some advice for how to handle a project I am working up the design on; It has an existing service I believe it is 800A (sorry working from photo's) the service consists of a meter outside on back wall with 800A disconnect and apparently has been double lugged to feed two 400A panels with another 100A subpanel feed from one of the main panels. The new facility has about half the load as the existing and possibly even less. Preliminary load is approx. 200A-225A (demand load) should I call for 250A fuses to replace the existing 800A fuses?
Thanks for the help!
I am seeking some advice for how to handle a project I am working up the design on; It has an existing service I believe it is 800A (sorry working from photo's) the service consists of a meter outside on back wall with 800A disconnect and apparently has been double lugged to feed two 400A panels with another 100A subpanel feed from one of the main panels. The new facility has about half the load as the existing and possibly even less. Preliminary load is approx. 200A-225A (demand load) should I call for 250A fuses to replace the existing 800A fuses?
Thanks for the help!