If I am adding up receptacle loads,they are a known number on the drawings,do I take for example 180va x 200(amount) =36,000 ,OR do I take the 36,000 and apply the demand factor to it? This are non dwelling buildings so can I take the first 10,000va at 100% and 50% of the rest or do I use the full 36,000va? Thanks