LarryFine
Master Electrician Electric Contractor Richmond VA
- Location
- Henrico County, VA
- Occupation
- Electrical Contractor
A little slack is reasonable, but you can't leave feet of slack for every circuit.
Unless your employer is known for making last minute changes on a regular occurrence or you suspect the mounting area may be altered due to free space or another reason, I would say go for it and use the excess wires for jumpersA little slack is reasonable, but you can't leave feet of slack for every circuit.
And how could the original installer have known whether three feet would be enough?He's moving the panel 3 ft. Where in most circuits are you going to be able to have 3 ft of slack ????
