The Georgia Institute of Technology run length table in section 250-95 confuses me. If I have a meter-main 850 feet away from our distribution panel, then technically I can't run an effective ground fault path back to the main. I'm not certain I should bother pulling the ground wire.
Question: Does 250-81 apply here?
Question: Does 250-81 apply here?