George S
Member
- Location
- Elk Grove Illinois
- Occupation
- Project Manager
I'm involved with a project that requires the removal of 3 - # 2 aluminum conductors with THW insulation in an 1 1/4" EMT. The vertical riser conduit starts on the fourth floor and terminates in the basement electric meter cabinet. I believe there are as many as 4 ninety degree bends. Any thoughts on pouring from the fourth floor a lubricant or product into the conduit to free the conductors from the interior of the raceway to facilitate their removal without breakage?