Replacing oven feed because of generator install??

Status
Not open for further replies.
I'm trying to figure out the reason for this rule, and if the appliance whip has the neutral and ground bonded together as they all do, why can't I move the braid to the ground bar in the panel and call it a ground?
 
Talk about nit picking.:rant: I can understand the reasoning for this (and technically the EI is correct) but I can't see making you replace the SE if it's buried inside finished walls and ceilings. If it's an easy change out I would just do it. Why don't EI's look for ways to pass jobs rather than find abstract ways to fail it ?
 