electricmanscott
Senior Member
- Location
- Boston, MA
My ballpark is 40K ish
200+ hours
200+ hours
400 A meter panel combo 1
200A inside panel 42 circuit 2
Generator hook up 1
100A or less subpanel 1
doorbell system (frt &bk) 1
My number is at $35155.79. with 154.14 billable hours.....
http://www.electrical-contractor.ne...wflat&Number=158109&page=0&fpart=1#Post158096
I will try and see if I can host it for a few days
Wow this has been compressing files for almost 2 hours
It looks like its taking each file and compressing it, the disc is 650 mb
Items NOT included:
The actual fixtures were NOT included [xenon, UC, surface strips, sconces, CFs]...rough wiring and mounting IS included.
Recessed cans included: housing, lamp and trim
My numbers are a little different...
336.92 manhours
$51,286.35
This does NOT include ANY allowances for:
Filing permits [time]
Permit fee [money]
Scheduling of inspections [time]
I also noticed you did not include any tele/data or cable/SAT information.
IMHO, not only do these clients want these items - they need them. $$
How many sq.ft is this condo ?
:smile:
EDIT:
Sorry for the delay...I went to dinner with 3 gorgeous girls ~ the wife and kids
EDIT:
Sorry for the delay...I went to dinner with 3 gorgeous girls ~ the wife and kids
WOW,