Just a clarification before the installation.
Wiring a 2500sqft residential ranch , lighting and recpt panel is in the center of the building or approx. 30ft away from the poco service drop/meter. Installation would be to provide a W/P fused disconnect outdoors next to the poco meter , feed into the building with SER wire, and supply a "Main Lug Only" panel for distrabution of the residential branch circuits as required. With this type of Install the actual service point is at the Fused W/P disconnect outdoors. According to 408.16 A ex.1 , it looks that my install will pass the NEC. Dont want to go thru the install just to find out from the local AHJ that I missed a something. What do you think?
Thanks in Advance, Mike
Wiring a 2500sqft residential ranch , lighting and recpt panel is in the center of the building or approx. 30ft away from the poco service drop/meter. Installation would be to provide a W/P fused disconnect outdoors next to the poco meter , feed into the building with SER wire, and supply a "Main Lug Only" panel for distrabution of the residential branch circuits as required. With this type of Install the actual service point is at the Fused W/P disconnect outdoors. According to 408.16 A ex.1 , it looks that my install will pass the NEC. Dont want to go thru the install just to find out from the local AHJ that I missed a something. What do you think?
Thanks in Advance, Mike