I dont know about Tenn am not even sure what ruff is in Mi but the way I do is have the service inspected with a circuit or even 2 a guy can use during construction and bag of connectors laying there with box of staples and a couple gfci and this presentation indicates the nature of the workmanship. I staple anything I am going to heat up, gfci, box covers and all the details to the service. Takes them about 30 seconds.
Last house I actually wired new I was involved after the permit was pulled, the owner was good craftsman and asked me to help with the wire pull and layout.
I wasnt there when he came for the ruff,, I asked, what did he say, said what you said he would say. I asked him if he nicked him about anything and he said, he suggest we move 1 outlet upstairs 2 ft,,, but, part of the wall want there yet which will bring it in without moving.