New service has to be located outside and all branch circuits are to be run verticaly outside from the top of the panel to the attic in a 2" PVC, sch. 80 conduit, over 24" long.
How does derating and wire fill apply to romex in this application?
[ April 23, 2005, 12:46 PM: Message edited by: camel ]
How does derating and wire fill apply to romex in this application?
[ April 23, 2005, 12:46 PM: Message edited by: camel ]