I'll be swapping out a panel , There are two right next to each other.(maybe the other in the future)
The current house has two drops, two meters two panels (two family)
I'm planing on grounding the one I replace as per what I need to do.
both panels have separate water grounds.
I will be putting two ground rods in for the panel being replaced.
Question.
would these two panels be treated as two separate services (grounding)?
4 ground rods, two water grounds.
Or should/could they be grounded together? 2 rods ,one water ground sized to the conductor size of both drops ?
Thank you
The current house has two drops, two meters two panels (two family)
I'm planing on grounding the one I replace as per what I need to do.
both panels have separate water grounds.
I will be putting two ground rods in for the panel being replaced.
Question.
would these two panels be treated as two separate services (grounding)?
4 ground rods, two water grounds.
Or should/could they be grounded together? 2 rods ,one water ground sized to the conductor size of both drops ?
Thank you