Pool Contractors are installing retaining screens with in 5 ft. of a pool instead of alarms per the Florida Building code.
After the cool deck is poured they drill holes in the deck and insert a nonmetallic sleeve. Then they install a aluminum pole into the insert which the screen is attached. They also make a nonmetallic pole but use a metal strip to attach the screen to the pole. I believe this is a violation of 2002 NEC Article 680.26(B)(3)and 680.26(B)(5)(1).
Any Ideas or input?
After the cool deck is poured they drill holes in the deck and insert a nonmetallic sleeve. Then they install a aluminum pole into the insert which the screen is attached. They also make a nonmetallic pole but use a metal strip to attach the screen to the pole. I believe this is a violation of 2002 NEC Article 680.26(B)(3)and 680.26(B)(5)(1).