I have been an electrician for 49 years and started as a resi electrician, now I do mostly instrumentation and control.
I have a 1930s house and have been rewiring it, its lath and plaster, I am bringing it up to 2017 NEC.
Comments
Lath and plaster is hard to cut for old work boxes, I use a multi-tool
I bought a Gardner Bender Staple Boss for run romex in the crawl, shoot the insulated staple, and then a tap with the hammer.
I run all the receptacle ckts in 12 and lighting is all separate, 14 there
Some of the circuits run by previous owners were OK, some were pretty hacked.
As common for older homes, a 200 amp panel was installed on the outside, then a 2" LB under with romex running to the crawl space, no clamps on romex going into LB. I installed a 4x4x18 wireway on the inside back to back with the panel, and then run down into crawl space.
Question- the walls are drafty, I can install switch and outlet plate gaskets, do any locations require those?
I have a 1930s house and have been rewiring it, its lath and plaster, I am bringing it up to 2017 NEC.
Comments
Lath and plaster is hard to cut for old work boxes, I use a multi-tool
I bought a Gardner Bender Staple Boss for run romex in the crawl, shoot the insulated staple, and then a tap with the hammer.
I run all the receptacle ckts in 12 and lighting is all separate, 14 there
Some of the circuits run by previous owners were OK, some were pretty hacked.
As common for older homes, a 200 amp panel was installed on the outside, then a 2" LB under with romex running to the crawl space, no clamps on romex going into LB. I installed a 4x4x18 wireway on the inside back to back with the panel, and then run down into crawl space.
Question- the walls are drafty, I can install switch and outlet plate gaskets, do any locations require those?