I recently had an inspection fail because I had installed schedule 40 PVC RNC for the line side of the meter can and as a nipple between the meter can (600a( and the main disconnect ( 600a 2p CB). The conduit come underground and turn up along the wall where the meter can and disconnect are mounted.The area in front of this equipment will be a concrete sidewalk.
The inspector wants me to replace the sch 40 with sch 80 PVC for the conduits entering the meter can and he wants a ridgid galvanized nipple between the meter can and disconnect(along with grounding bushings).
Other than a concern for physical damage, which I do not believe is the case since there is a concrete sidewalk, is there some other code section that prohibits my instaslltion as stated above?
The inspector wants me to replace the sch 40 with sch 80 PVC for the conduits entering the meter can and he wants a ridgid galvanized nipple between the meter can and disconnect(along with grounding bushings).
Other than a concern for physical damage, which I do not believe is the case since there is a concrete sidewalk, is there some other code section that prohibits my instaslltion as stated above?