darrylcooper
Member
Question, When bringing up pvc from under ground that will go through concrete, I have seen the 90 be Pvc and I have seen it be change over to rigid. What is the different is this a AHJ thing or spec. thing. I have done them both way for different contractors I have work for. is this A code thing? if so where is it located.