So they are demoing two panels(LPNE-1 & LPSE-1) which are feeding other panels on the upper floors.
LPNE-1 & LPSE-1 are 120/208v 225a panels.
LPNE-1 & LPSE-1 are being fed from a main switchboard.
They want us to extend the line and load side of the two panel and put a splice box.
Notes #8 &10 only refer to the panel size and to provide a splice box.
I sent an RFI in and they said to provide as required. Ridiculous.
How can a 225A panel feed all the panels on the upper floors? Too small more than likely?
I’d think there is a riser running larger size wires and tapping off?
LPNE-1 & LPSE-1 are 120/208v 225a panels.
LPNE-1 & LPSE-1 are being fed from a main switchboard.
They want us to extend the line and load side of the two panel and put a splice box.
Notes #8 &10 only refer to the panel size and to provide a splice box.
I sent an RFI in and they said to provide as required. Ridiculous.
How can a 225A panel feed all the panels on the upper floors? Too small more than likely?
I’d think there is a riser running larger size wires and tapping off?