mdshunk said:Where are you reading this? Wiring 1-2-3?
gfnasin said:...There is nothing stating if it is legal to run down when tying into a panel.What is the proper procedure for that
I usually install either a small piece of 3/4" plywood on the block walls or a piece of 2x4 or 2x6 in order to staple the wire into the panel.gfnasin said:In an unfinished basement you shall run romax smaller than 6-2 or 8-3 through bored holes and protected if run down the walls.There is nothing stating if it is legal to run down when tying into a panel.What is the proper procedure for that
No, just asking where he came up with that statement. It certainly doesn't mirror the NEC very well. I thought it was either copied and pasted from a local amendment or the Wiring 1-2-3 book. There are certainly other ways to run cables overhead smaller than 6-2 or 8-3 other than just running them through bored holes.Dennis Alwon said:Marc are you trying to scare the newbie away?
guschash said:When we drop down into the panel, we are required to protect the NM in flex or conduit. AHJ in my area require this. They don't like the plywood and strapes.
guschash said:When we drop down into the panel, we are required to protect the NM in flex or conduit. AHJ in my area require this. They don't like the plywood and strapes.
guschash said:When we drop down into the panel, we are required to protect the NM in flex or conduit. AHJ in my area require this. They don't like the plywood and strapes.
iwire said:Would they accept you coming down the face of the plywood then covering the cables with another piece of plywood?
We sometimes do that with sheet metal to hide MC cables.