Rough in for single family dwelling

Status
Not open for further replies.
On the larger homes we do, we try to get everything nailed up after roof is blacked in, then drill out and pull wire after the tinners are 2/3rds the way along. Smaller houses other trades done and gone before we start.
 
On the larger homes we do, we try to get everything nailed up after roof is blacked in, then drill out and pull wire after the tinners are 2/3rds the way along. Smaller houses other trades done and gone before we start.

Yep, same here.
 
Status
Not open for further replies.
Top