OK so here are my questions. Can I run a subpanel from a subpanel? Subpanel (A)(existing subpanel) has a three wire feed from the main ran underground through metal conduit and ground and neutrals are connected, I am guessing because this met code not long ago so I guess my question is do I need to run a 4th wire from main panel to subpanel(A) before running 4 service entrance wires to subpanel (B)(new subpanel) or use the conduit as a ground and seperate ground and neutral bus bars Also subpanel(B) will be about 250 ft away will that cause voltage drop?