We are wiring some motors and level sensors in a vault that is rated Class I Div 2 and the engineer lists using Schedule 40 PVC for conduit in the vault. I don't see Schedule 40 PVC listed as an acceptable wiring method for Class I Div 2.
Am I missing something?