Hello All,
I am a maintenance electrician and deal a bit with Industrial installations in our plant. Unfortunately I am a bit rusty when it comes to residential. Also, most of the guys I work with are in the same boat. I'm glad I found this site as I am learning a lot just reading through the various posts.
Here is my situation. I am building a detached garage at my house. I installed a 100A sub panel in the garage and am planning to feed it from my main panel in the house. I ran 2 inch rigid Sch 40 PVC between the house and garage (appx 60 feet). I would like to run aluminum conductors to the garage. I've already bought 120ft of 2-2-2 SE typeU Al cable for the job. But I'm thinking SE is not the correct stuff. I am also planning to run 3 conductors out there and install 2 ground rods (already done) at the garage. Also, I need to run about 20 feet inside of the basement to get to the main panel and I'd prefer not to run it in pipe all the way if I can avoid it.
My questions are can I use the SEU? I'm also thinking 2-2-2 AL is not the correct size because I don't think I can use the dwelling unit exception for the garage? If SEU cannot be used in this situation what should I be using? UF? URD?
This job is not going to be inspected (no inspections in my area) but I still want it to be right.
Thanks for any help
I am a maintenance electrician and deal a bit with Industrial installations in our plant. Unfortunately I am a bit rusty when it comes to residential. Also, most of the guys I work with are in the same boat. I'm glad I found this site as I am learning a lot just reading through the various posts.
Here is my situation. I am building a detached garage at my house. I installed a 100A sub panel in the garage and am planning to feed it from my main panel in the house. I ran 2 inch rigid Sch 40 PVC between the house and garage (appx 60 feet). I would like to run aluminum conductors to the garage. I've already bought 120ft of 2-2-2 SE typeU Al cable for the job. But I'm thinking SE is not the correct stuff. I am also planning to run 3 conductors out there and install 2 ground rods (already done) at the garage. Also, I need to run about 20 feet inside of the basement to get to the main panel and I'd prefer not to run it in pipe all the way if I can avoid it.
My questions are can I use the SEU? I'm also thinking 2-2-2 AL is not the correct size because I don't think I can use the dwelling unit exception for the garage? If SEU cannot be used in this situation what should I be using? UF? URD?
This job is not going to be inspected (no inspections in my area) but I still want it to be right.
Thanks for any help